[1]
KENCANA, S. 2019. preliminary Studi Penyebab Keterlambatan Penyelesaian Proyek-Proyek Infrastruktur di Kota Binjai: ABSTRACT. Inovasi. 16, 2 (Oct. 2019), 105–114. DOI:https://doi.org/10.33626/inovasi.v16i2.153.